Borehole Drilling · Engineer-Led · Sydney
Borehole Drilling. Logged As It Comes Up.
A borehole is only as good as the person reading it. SFGEO’s 4WD-mounted rig drills Sydney’s clays, sands, shales and residual profiles with the engineer at the hole, reading every layer as it surfaces, testing as it goes, and sampling what the design will need. Metro and regional NSW.
Solid flight and hollow stem augers · Every hole logged on site, engineer-checked · Fixed fee in writing within one business day · Sydney metro and regional NSW · 5.0 from 33 Google reviews

The Flight

The Sample
01 · The Method
From The Flight To The Log.
Solid flight augers for Sydney’s clays and residual soils; hollow stem when the hole needs support; DCP testing at every hole, and SPT on consultancy and commercial programmes, to put numbers behind the descriptions. The material comes up, gets read in the hand, and goes on the log in the field, because the ground doesn’t look the same in a photo the next day.
02 · The Deliverables
What A Borehole Buys You.
The Soil Profile
Every layer logged as it comes off the flights, material, moisture and consistency, and checked by the engineer, not reconstructed later.
In-Situ Strength
Dynamic Cone Penetrometer testing beside every hole, and Standard Penetration Testing down the hole to the quoted depth on consultancy and commercial programmes, so the log carries numbers as well as descriptions.
Groundwater Observations
Seepage and standing water levels recorded during and after drilling, the observation that changes basement and footing design most often.
Samples For The Lab
Disturbed and undisturbed samples taken at the depths that matter, bagged, labelled and tracked to NATA-accredited laboratories when testing is warranted.
03 · Scoped To The Job
As Deep As The Question. No Deeper.
A granny flat doesn’t need the borehole a basement does. Investigation depths are scoped to the structure and the ground: through the reactive zone for footings, below founding level for piers, deep enough to see what a basement excavation will meet. Where the ground turns to rock, NMLC rock coring takes over; where the rig can’t reach, tight access methods do.
All Drilling Services→Common Questions
Engineer-led boreholes for site classifications, geotechnical investigations and subcontract programmes for other consultancies, drilled with solid flight and hollow stem augers. The engineer stands at the hole, reading every layer against AS 1726, testing as it goes and sampling what the design will need. Quoted per site, with a fixed fee in writing within one business day. Metro and regional NSW.
Holes This Week? Ask.
Send the address, the number of holes and the depths if you know them. A fixed fee in writing within one business day.