An open excavation costs money every hour it waits. SFGEO inspects footings, piers and fill at the moment it matters, confirms the ground against the design on site, and puts the record in writing, so the next trade starts on time.

Footing and pier inspections from $600 + GST · Fixed fee in writing within one business day · Engineered fill supervised layer by layer to AS 3798

SFGEO engineer running a dynamic cone penetrometer in an open excavation beside a Newtown terrace before the pour

At Bearing Level

01 · On Site

The Answer, On Site.

The engineer inspects at bearing level, logs the exposed stratum, and gives the call before leaving site: proceed, deepen or adjust. The formal record follows within days. Compaction testing through our partners is folded into the same visit where the spec calls for it. Single visits are quoted from $600 + GST as a fixed fee per inspection, in writing, within one business day.

02 · Scope

Footing Inspections. What We Verify.

Footings & Piers

Founding material verified against the structural drawings’ bearing requirement at excavation level.

Piles & Anchors

Founding and socket verification for bored piers and piles, with the geotechnical record certifiers ask for.

Engineered Fill (AS 3798)

Layer-by-layer placement supervision and testing frequency to the standard your certifier expects.

Proof Rolls

Subgrade proof rolling observed and documented before the pavement goes down.

Working Platforms

Platform assessments supporting safe temporary works for cranes, rigs and heavy plant.

Compliance Records

Inspection records written against council orders and certifier directions, the documents that get sites moving again.

03 · How A Visit Runs

Booked Fast. Called On Site.

01

Call Or Book

Send the drawings and the excavation date. Single visits for builders, a standing schedule of rates for contractors.

02

Engineer On Site

At bearing level when the excavation is open: day works, night works, or the morning the formwork is due.

03

The Call, There

Proceed, deepen or adjust, read against the drawings and the original investigation before anyone leaves.

04

Record In Writing

The formal inspection record follows within days, written to what your certifier needs to close it out.

04 · Proven On Site

Calls We’ve Made Standing In The Hole.

A church expansion’s tank base verified at 500 kPa and approved the same visit. A signal-pole footing on a six-lane State road failed against the standard at 2am. Called not-suitable on the spot, backfilled, and the road open by morning. The value of construction phase support is the judgement at the moment it’s needed, either way it goes.

Read The Case Studies→

Common Questions

Construction phase support is the engineer on site for builders and contractors: footing, pier and pile inspections, proof rolls and engineered fill to AS 3798. An open excavation costs money every hour it waits, so SFGEO confirms the ground against the design on site and gives the call before anyone leaves. Single visits are priced from $600 + GST, fixed in writing within one business day, and the record follows within days.

Open Excavation? Call Now.

Send the drawings and the date the excavation opens. The engineer is on site at bearing level, and the call is made before anyone leaves.