Tight Access · Principal-Led · Sydney
Tight Access Drilling. No Site Out Of Reach.
Terraces, battleaxe blocks, backyards and basements: the Sydney sites where standard rigs stop at the kerb. SFGEO investigates them with motorised hand augers and a 4WD-mounted rig, operated by the engineer who logs the ground and signs the report. Fixed fees, scoped to your block.
Fixed fee, quoted per site · Reports as soon as 2 business days from fieldwork · Response within one business day

Backyard Borehole

Terrace Courtyard · Inner West
01 · The Method
Same Data. Harder Sites.
A tight site should not mean a thinner report. Hand-auger boreholes are logged to the same standard as rig holes and cross-checked with dynamic cone penetrometer testing on the spot, so your structural engineer gets the same parameters whether the hole was advanced by a rig on the street or an auger carried through the hallway.
02 · Site Types
The Sites We’re Built For.

Side Passage · Punchbowl

Undercroft · Restricted Height
Inner West Terraces
Through the hallway or over the back fence, motorised hand augers reach rear yards no rig can.
Battleaxe Blocks
Long shared driveways and landlocked building envelopes, drilled without disturbing the neighbours.
Rear-Yard Granny Flats
Investigation points behind an occupied home, with the yard left the way we found it.
Basements & Under Cover
Restricted-height drilling inside garages, basements and undercrofts.
Sloping & Stepped Sites
Benched blocks and steep boundaries where a truck-mounted rig stops at the kerb.
Zero-Clearance Courtyards
Internal courtyards and side passages down to a doorway’s width.
03 · Where We Work
Where The Hard Sites Are.
Marrickville, Newtown, Enmore and the Inner West terraces we call home. Paddington and Surry Hills rows. Eastern Suburbs battleaxe blocks, North Shore slopes, and the granny-flat boom across Canterbury-Bankstown and the Hills. If the rig cannot reach it, the augers can, and the engineer comes with them.
Common Questions
Restricted-access geotechnical drilling is for anyone building on a Sydney site where a standard rig stops at the kerb: terraces, battleaxe blocks, backyards, courtyards and basements. SFGEO investigates them with motorised hand augers and a 4WD-mounted rig, operated by the engineer who logs the ground and signs the report. Fixed fees, scoped to your block. Site classification reports follow as soon as 2 business days from fieldwork.
Hard To Reach? Perfect.
Send the address and a photo of the access. You’ll have a fixed fee in writing within one business day.