Skip To Content

North Shore · Principal-Led · Sydney

Geotechnical Engineering. North Shore.

Site classifications, geotechnical investigations and footing inspections on Sydney’s North Shore. This is what we found on our own jobs here. Each result belongs to its site, so send us your address and we will read yours.

Site classifications from $800 + GST · Footing inspections from $600 + GST · Fixed fee in writing within one business day · 5.0 from 33 Google reviews

Layered sandstone outcrop among eucalypts at Hunters Hill

Sandstone Outcrop · Hunters Hill

01 · Recent Jobs

What We Found, Job By Job.

SFGEO hand auger borehole in a terraced garden at Neutral Bay, worked from a brick garden path

Hand Auger · Neutral Bay

Geotechnical Investigation

A Granny Flat Over Fill And Stepped Rock

Neutral Bay · lightweight granny flat on a sloping block

The brief. A lightweight modular granny flat on piers, on the lower level of a sloping block. Access was by stairs, so the work was done with hand-portable equipment.

On the ground. Five hand-auger boreholes refused in fill at 0.3 to 0.5 metres. Four penetrometer tests refused at 0.6 to 2.5 metres, read as the rock surface. Weathered sandstone was exposed across the garden, and the Sydney 1:100,000 Geological Series Sheet 9130 maps the site on Hawkesbury Sandstone.

The outcome. The rock surface was stepped and irregular, so levels could not be carried between test positions. The founding stratum is to be confirmed at each support.

5 hand-auger boreholes + 4 DCPs · Hand-portable access · Founding to be confirmed at each support

Bored pier holes with reinforcement cages on a cut building platform at Hunters Hill, the excavated face beside them

Cut Platform · Hunters Hill

Geotechnical Investigation

Ground Checked After The Bulk Dig

Hunters Hill · new three-storey home on piles

The brief. A new three-storey home designed on bored piles socketed into rock. The old house had been demolished and the site cut to a level platform, so the work read the ground then exposed against the pile design.

On the ground. Two excavator test pits went to practical refusal through orange-brown to grey silty clay, into material with the look and feel of weathered shale and laminite. Published 1:100,000 mapping shows Ashfield Shale.

The outcome. The inferred rock surface fell from west to east across the site, so it was reported as indicative only, with geotechnical inspection of the first piles to confirm the founding.

2 excavator test pits · Weathered shale and laminite at refusal · Pile inspections recommended

Footing Inspection

Checked Before Concrete

Hornsby · retaining wall footing

We inspected a block retaining wall footing against the structural drawings, with penetrometer testing, before concrete.

02 · Services

What We Do Here.

Site Classification

AS 2870 site classifications for homes and granny flats.

Geotechnical Investigations

Investigations to AS 1726 for DAs, CDCs, basements and footings.

Construction Phase Support

Inspections, up to the last one before the pour.

Tight Access

Motorised hand augers carry through a standard doorway or side passage, so rear yards and courtyards can be investigated without vehicle access.

Testing

Dynamic cone penetrometer testing, and NATA-accredited laboratory testing where the design calls for it.

Common Questions

Start With The Ground.

Send the address. The desktop geology is checked before we even quote.