Skip To Content

Parramatta · Principal-Led · Sydney

Geotechnical Engineering. Parramatta.

Geotechnical investigations, site classifications and drilling from Parramatta to Northmead and South Wentworthville, for owners, builders and other consultancies. This is what we found on our own jobs here, and how we drilled one for another firm. Each result belongs to its site, so send us your address and we will read yours.

Site classifications from $800 + GST · Footing inspections from $600 + GST · Fixed fee in writing within one business day · 5.0 from 33 Google reviews

SFGEO drill rig set up under a large gum in a Parramatta car park, two crew in hi-vis beside it and the city towers behind

Car Park Drilling · Parramatta

01 · Recent Jobs

What We Found, Job By Job.

Auger drilling through the asphalt of a Parramatta car park, red-brown spoil around the hole

Auger Through Pavement · Parramatta

Drilling For A Consultancy

Five Boreholes Through A Car Park

Parramatta · soil sampling on a development site, for a consultancy

The brief. A consultancy needed soil samples from beneath a car park on a development site. The programme was booked over two days.

On the ground. We brought the 4WD-mounted rig and drilled through the car park pavement. The consultancy's engineer logged each hole and took the samples. On the day, the scope settled at five boreholes.

The outcome. All five were drilled in a single day, so the second day was not needed.

5 boreholes in one day · Logged and sampled by the consultancy · 4WD-mounted rig

SFGEO operator in hi-vis beside the 4WD-mounted rig on a cleared site at Northmead, a spoil mound behind

Rig · Northmead

Geotechnical Investigation

A Church Car Park Over Old Fill

Northmead · new car park pavement at a church, for a civil contractor

The brief. A new car park over existing uncontrolled fill, part of a larger church expansion. The investigation characterised the subgrade for the pavement design.

On the ground. Three rig boreholes and three penetrometer tests, on an active site after rain. The fill ran from about 0.5 metres to more than 1.5 metres deep, with brick, concrete, glass and steel that stopped the auger at two offset positions. Below it, very stiff to hard residual clay graded into extremely weathered siltstone.

The outcome. The existing stabilised pavement could be kept and extended as a cement-modified pavement over a proof-rolled, geogrid-reinforced subgrade, rather than the unbound pavement first designed.

3 rig boreholes + 3 DCPs · Fill to more than 1.5 metres · Geogrid-reinforced pavement

Penetrometer standing in a front lawn at South Wentworthville, the back of the SFGEO rig beside it

Penetrometer · South Wentworthville

Geotechnical Investigation

A Basement Into Clay And Shale

South Wentworthville · two-storey home over a basement garage

The brief. A knock-down rebuild with a basement garage cut 2.4 to 4.1 metres below the surface, close to both side boundaries. The structural engineer asked for excavation support parameters and the bearing capacity at basement level.

On the ground. Three rig boreholes with penetrometer tests found residual silty clay with ironstone gravel to 2.3 to 3.0 metres, soft to firm near the surface in places and stiff to hard below, passing into weathered shale at 4.0 to 4.4 metres. No groundwater was encountered.

The outcome. The basement platform sits in hard clay and extremely weathered shale over most of the footprint, and in shale at the front. The site was found suitable for the excavation with every face supported, and the report gave the shoring, bearing and pile inputs.

3 rig boreholes with penetrometer tests · Shale at 4.0 to 4.4 metres · Shoring and bearing parameters

02 · Services

What We Do Here.

Geotechnical Investigations

Investigations to AS 1726 for DAs, CDCs, basements and pavements.

Site Classification

AS 2870 site classifications for homes, duplexes and granny flats.

Drilling For Consultancies

Boreholes on the 4WD-mounted rig for other consultancies, logged by us or by their engineer.

Concrete Coring

$120 + GST per hole, three-hole minimum per visit, for slabs and hardstands.

Construction Phase Support

Footing and pier inspections, up to the last one before the pour.

Common Questions

Start With The Ground.

Send the address. The desktop geology is checked before we even quote.