Skip To Content

South West Sydney · Principal-Led

Geotechnical Engineering. South West Sydney.

Site classifications for granny flats and new homes from Hinchinbrook to Chipping Norton, and drilling for consultancies on new lots at Austral. Reactive clay and old fill decide most results here, so the class is tested, never assumed. This is what we found on our own jobs. Send us your address and we will read yours.

Site classifications from $800 + GST · Footing inspections from $600 + GST · Fixed fee in writing within one business day · 5.0 from 33 Google reviews

SFGEO drill rig side-on with its mast raised on a cleared greenfield lot at Austral, a new house under construction behind

Greenfield Lot · Austral

01 · Recent Jobs

What We Found, Job By Job.

Hand-auger spoil laid out in depth order on a blue tarp beside a tape measure at Hinchinbrook

Soil Profile · Hinchinbrook

Site Classification

Two Buildings, Two Depths Of Fill

Hinchinbrook · granny flat and studio, engaged through an engineering consultancy

The brief. A granny flat and a studio side by side in a rear yard, with no drawings yet. The classification and bearing pressures had to cover both buildings.

On the ground. Two hand-auger boreholes and four penetrometer tests. Fill was 0.4 metres deep under the eastern building and 1.2 metres under the western one, over medium plasticity residual clay that continued below the 1.5 metre boreholes. Three penetrometer tests stayed in stiff to very stiff ground to 2.6 to 2.8 metres; the fourth refused at 2.4 metres.

The outcome. Class P as it stands, for the deeper fill and a disused sewer trench crossing the rear of both buildings, on a Class H1 reactivity basis with the upper bound of 60 millimetres adopted for design.

2 hand-auger boreholes + 4 DCPs · Class P on an H1 basis · Fill to 1.2 metres

SFGEO operator at the 4WD-mounted rig on a narrow strip of lawn beside a side fence at Chipping Norton

Rear Yard · Chipping Norton

Site Classification

A Granny Flat On Highly Reactive Clay

Chipping Norton · secondary dwelling, for a builder

The brief. A secondary dwelling in the rear yard of a corner lot, classified before the design was drawn. Most of the footprint was paved, with a service line across it.

On the ground. The rig drilled one borehole to 3.0 metres on the only strip of open ground inside the footprint, beside one penetrometer test. About 0.5 metres of topsoil and uncontrolled fill over stiff to very stiff residual silty clay of medium to high plasticity, with ironstone gravel, to the base of the hole. No groundwater.

The outcome. Class P as it stood, because of the fill, and reclassified Class H2, highly reactive, for design, with founding and bearing parameters for the structural engineer.

1 rig borehole to 3.0 metres + 1 DCP · Class H2 · Rig set up in a narrow rear yard

SFGEO rig drilling in the middle of an open, cleared lot at Austral under a cloudy sky

Drilling · Austral

Drilling For A Consultancy

Two Greenfield Lots In A Day

Austral · two residential lots, for a consultancy

The brief. A consultancy needed boreholes on two residential lots for its own reports. We drilled, tested and logged; the consultancy wrote the reports.

On the ground. Four boreholes to the two-metre target depth with the 4WD-mounted rig, with a penetrometer test beside each. Silty clay fill was 0.3 to 0.6 metres deep on one lot and 1.2 to 1.5 metres deep on the other. Every hole was dry on completion.

The outcome. Both lots were drilled and logged in a single visit, with a log set issued for each lot.

4 boreholes + 4 DCPs · Two lots, one visit · Dry on completion

02 · Services

What We Do Here.

Site Classification

AS 2870 site classifications for granny flats, studios and new homes.

Geotechnical Investigations

Investigations to AS 1726 for DAs, CDCs, basements and footings.

Drilling For Consultancies

Boreholes drilled and logged on the 4WD-mounted rig for other consultancies' reports, on new estates and established streets.

Construction Phase Support

Footing and pier inspections, up to the last one before the pour.

Testing

Dynamic cone penetrometer testing, and NATA-accredited laboratory testing where the design calls for it.

Common Questions

Start With The Ground.

Send the address. The desktop geology is checked before we even quote.